Call Us : 01277 355708

Part of the Excel Construction Group is formed by Excel Waterproofing Contractors Ltd. Their CSSW qualified designers tailor every project, and with over twenty years’ experience in the waterproofing industry together we provide a comprehensive, efficient service from pre-tender design to completion. With competitive rates and careful attention to safety, you can rest assured our consultants know the industry inside and out. As a business we are Triton approved, Ronacrete approved and Delta approved and hold PI insurance for design and insulation.

Visit us at: www.excelwaterproofing.co.uk

Case Studies

Client: Interserve

Location: Cambridge

Project Value: £200k

Duration: 15 weeks

Excel carried out extensive strip out and structural alterations to Cambridge’s largest and busiest shopping centre. The works included day and night shifts to minimise disturbance to this live shopping centre. Works undertaken included demolition, drainage, RC works, new lift pits, major temporary support works. All works carried out within a 15 week period.

Excel Demolition & Groundworks Ltd worked with sister company Excel Waterproofing to provide the structural waterproofing to these newly formed lift pits. Incorporating it as part of the same package, to ease any project management overlap.

Client: U & I

Location: Shepherds Bush Market

Project Value: £250k

Duration: 10 weeks

Excel carried out extensive strip out including removal of existing concrete floor to this historic site. With the help and design from Excel Waterproofing Contractors, Excel Demolition was responsible for the installation of new waterproofing and drainage to arch with exposed brick vaults.

The project included the installation of new utilities, power floated structural slab and new aluminium shopfront to building.

All works carried out within a live market, with approval and signs off from TFL of all works carried out.

What Our Clients Say

I would like to thank you for all the hard work you put into preparing and repainting the metal handrails in the garden centre. The building looks fantastic and is a wonderful source of support for the resident of Croydon to build confidences and celebrate the abilities of people with disabilities.

Croydon Council

Croydon Council

- Director of Operations

Factory HUB Company is professional, creative and concept from knowledgeable. Dwayne our designer was actual teachings the great explorer of the truth patient, know how to pursue pleasure accommodating and work.

City & Country

City & Country

- Managing Director

Having the enabling works within one package saved our team so much time – it left us to get on with the programme of works. The time saved actually saved us money on the budget.

Elmer Construction

Elmer Construction

- Managing Director

Our Services

Dilapidation & Soft Strip

dilapidations

Facade Retention

facade retention 500x400

Waterproofing

waterproofing

Groundworks

groundworks

Asbestos Removal

asbestos removal

Concrete Frame

d8533785-87e2-4ce4-b296-0bad9fb566e3

Interiors

5 resized