Call Us : 01277 355708

Client: Private Developer

Location: The Grand, Leigh-On-Sea

Project Value: £2.1million

Duration: 39 weeks

 

Excel completed a full asbestos removal of notifiable material, using the quilling method for removing asbestos residue to walls. Excel then completed a full strip out of the existing building, and demolition of existing older extensions.

Temporary works through out the building, including small facade retention and forming of new openings followed the strip out.

The building required double underpinning to the rear and side walls for the new basement extension to the rear of the property, along with this a complete contiguous piled wall that now forms the new basement walls.

More Case Studies