As part of our development services, Excel have recently launched Excel Interior Contractors Limited. This new arm of Excel Group covers all aspects of interior development including dry lining, plaster, brickwork and finally the intricate and detailed finishes that our clients seek. The addition of Excel Interior Contractors Limited nicely rounds out our service offering, making us the first choice for clients seeking a full service delivery contractor from beginning to end.

Case Studies

Client: U & I

Location: Shepherds Bush

Project Value: £650k

Duration: 20 weeks

Excel worked together with consultants U+i to create this ‘container city’ to rival Shoreditch’s Boxpark. Utilising the acre of waste land located between the current market, and residents along Pennard Road, work commenced to make a suitable market place and meeting area.

The pop up Market is open for cafes, restaurants, artists’ studios and co-working spaces in 74 glass-fronted containers designed in a similar style to Pop Brixton and Shoreditch’s Boxpark.

Excel acted as Principal Contractor on the Old Laundry Yard, Shepherd’s Bush Market  project.

Client: U & I

Location: Shepherds Bush Market

Project Value: 250k

Duration: 10 weeks

Excel carried out extensive strip out including removal of existing concrete floor to this historic site. With the help and design from Excel Waterproofing Contractors, Excel Demolition was responsible for the installation of new waterproofing and drainage to arch with exposed brick vaults.

The project included the installation of new utilities, power floated structural slab and new aluminium shopfront to building.

All works carried out within a live market, with approval and signs off from TFL of all works carried out.

Client: U & I

Location: Finsbury Park

Project Value: 350k

Duration: 14 weeks

Excel acted as principle contractor on this time and noise sensitive project. Excel was responsible for the isolation of existing services and then extensive soft strip of this commercial factory. The 15,000m2 factory space and 10,000m2 commercial offices were surrounded on each side by busy, live office environments, meaning noise and transport logistics were heavily considered and managed throughout the project.

What Our Clients Say

I would like to thank you for all the hard work you put into preparing and repainting the metal handrails in the garden centre. The building looks fantastic and is a wonderful source of support for the resident of Croydon to build confidences and celebrate the abilities of people with disabilities.

Croydon Council

Croydon Council

- Director of Operations

Factory HUB Company is professional, creative and concept from knowledgeable. Dwayne our designer was actual teachings the great explorer of the truth patient, know how to pursue pleasure accommodating and work.

City & Country

City & Country

- Managing Director

Having the enabling works within one package saved our team so much time – it left us to get on with the programme of works. The time saved actually saved us money on the budget.

Elmer Construction

Elmer Construction

- Managing Director

Our Services

Dilapidation & Soft Strip

dilapidations

Facade Retention

facade retention 500x400

Waterproofing

waterproofing

Groundworks

groundworks

Asbestos Removal

asbestos removal

Concrete Frame

d8533785-87e2-4ce4-b296-0bad9fb566e3

Interiors

5 resized